Login
Convey Atchafalaya River Water to Northern Terrebonne Marshes/
Multipurpose Operation of the Houma Navigation Lock
Project Name Underline
LCA.gov LCA.gov
  • Program
  • Projects
    • Medium Diversion at Myrtle Grove
    • Terrebonne Basin Barrier Shoreline Restoration
    • Barataria Basin Barrier Shoreline Restoration
    • Land Bridge between Caillou Lake and the Gulf of Mexico
    • Mississippi River Gulf Outlet Canal (MRGO) Environmental Restoration
    • Medium Diversion at White Ditch
    • Gulf Shoreline at Point au Fer Island
    • Convey Atchafalaya River Water to Northern Terrebonne Marshes/Multipurpose Operation of the Houma Navigation Lock
    • Small Diversion at Convent/Blind River
    • Amite River Diversion Canal Modification
    • Modification to the Davis Pond Diversion
    • Beneficial Use of Dredged Material (BUDMAT)
    • Small Diversion at Hope Canal
    • Small Bayou Lafourche Reintroduction
    • Modification to the Caernarvon Diversion
  • Convey Atchafalaya River/Houma Nav Lock: 
  • Home
  • Map
  • Calendar
  • Documents

Final LCA Reports - Volume III

Convey Atchafalaya River Water to Northern Terrebonne Marshes and Multipurpose Operation of the Houma Navigation Lock

The publications on this page are presented in Portable Document Format (PDF); the latest version of Adobe Reader or similar software is required to view them. Download the latest version of Adobe Reader, free of charge.

  • Final Integrated Feasibility Study and Environmental Impact Statement
  • Water Quality Certification
  • Appendices
    • A - Biological Assessment
    • B - U.S. Fish and Wildlife Service Coordination Letter and Report
    • C - NOAA Fisheries Service Coordination Letter
    • D - 404(b)(1) Evaluation
    • E - Consistency Determination
    • F - Cultural Resources Appendix
    • G - Responses to Comments
    • H - Value Engineering Report
    • I - Adaptive Management/Monitoring Plan
    • J - Real Estate Plan
    • K - Economics Appendix Benefit / Cost – Incremental Cost Analysis
    • L - Engineering Appendix
      • Annex 1 - Detailed Construction Cost Estimates for Studied Alternatives*
      • Annex 2 - Detailed Hydraulic Modeling Studies
      • Annex 3 - Sensitivity Analysis
      • Annex 4 - Engineering Drawings
      • Annex 5 - Total Project Cost Summary
    • M - Wetland Value Assessment (WVA) Model Report
    • N - Phase I Environmental Site Assessment
    • P - Project Costs and Schedule Risk Analysis Report
    • Q - Recreation Incidental Benefits

*Detailed governmental cost estimates are not available for public release. A summary at the sub-feature scale is being prepared and will be released when finished.
  • Site Info
  • Disclaimer
  • Privacy & Security
  • Accessibility
  • FOIA
  • Information Quality Act
  • Acknowledgements
  • Get in Touch
  • Public Inquiries
  • Contact Us

  • Archived Resources
  • Technical Area
  • Past Studies
  • Acadiana Bays Feasibility Study
  • New Orleans East Land Bridge (NOELB)
  • CWPPRA Overview & Integration
  • LCA Final Study Report
  • Study Objectives
  • Chief's Report
  • External Links
  • LCA Science & Technology (S&T) Office
  • USACE LA Coastal Protection and Restoration
  • Mississippi River Gulf Outlet (MRGO)
  • USACE MVN | USGS | DNR
  • Coast 2050
  • LaCoast